Buying guides/Export preparation

Export preparation · 4 Aug 2026 · 5 min read

The machine information needed before export loading

A buyer-focused list of dimensions, weights, dismantling points, lifting needs, and document checks required before shipping machinery.
XCMG rotary drilling rig prepared for delivery

Confirm the transport configuration

Record operating and transport dimensions separately. Note removable counterweights, mast sections, Kelly bar, drill tools, support legs, roof guards, and any loose accessories that require a separate packing list.

  • Transport length, width, height, and total weight
  • Largest dismantled piece and lifting-point information
  • Number of containers, flat racks, or break-bulk pieces
  • Packing list for tools, rods, hoses, and accessories

Match documents to the exact machine

The model, serial number, engine number, invoice description, packing list, and photos should identify the same unit. Resolve differences before the machine reaches the port.

Turn the requirement into a machine shortlist.

Send the work, depth, ground, budget, and destination. We will narrow the equipment before confirming a unit.

Send requirement