193Loading…
Loading…
Loading equipment…
193
194
195
196
197
198
199
200
201
202
203Foundation piling and bored pile work after confirming the required hole diameter, depth, geology and tools.
204
205
206
207
208After confirming the operating weight, bucket configuration and site requirements, it can be used for earthmoving, trenching and loading work.
209
210Portable compressed air supply for drilling, mining and construction after confirming pressure and flow requirements.
211Portable compressed air supply for drilling, mining and construction after confirming pressure and flow requirements.
212Drilling of rock and surface holes after confirming hole diameter, depth, formation and air requirements.
213Drill rock and surface holes after confirming the hole diameter, depth, formation and air requirements.
214Drilling of rock and surface holes after confirming hole diameter, depth, formation and air requirements.
215Drilling rock and surface holes after confirming hole diameter, depth, formation and air requirements.
216Drill rock and surface holes after confirming hole diameter, depth, formation and air requirements.